CONSTRUCTION STAGE

  • Preparation of a file of documents necessary for solving property and land ownership issues that may arise in the course of release of the construction area; processing of documents governing land property ownership for the period of construction.
  • Obtaining permits for demolition of existing buildings.
  • Arrangement of resettlement (relocation) and demolition of existing buildings.
  • Organization of re-laying of utility networks from the construction area.
  • Plotting of dendrologic plans and compensatory measures, procurement of approvals for felling and transplantation of greenery.
  • Organization of hydro-technical actions and remediation of soils.
  • Preparation of bidding packages and organization of bids for supply of contracted construction services, including assessment of participants’ qualifications and participation in assessment of tender proposals.
  • Preparation and control of flowcharts for construction and other services
  • Creation of construction budgets and execution control.
  • Gradual acceptance of detailed design plans, control of their correspondence to the contract conditions, technical assignment, approved documentation, norms and rules, with further transfer to the Primary Contractor with a stamp, approving further works.
  • Organization of obtaining of all necessary permits and approvals, including permit for construstion.
  • Organization and controll over transfer of the construction area to the Primary Contractor, control over contents of the area.
  • Organization of technical supervision and control over the construction process.
  • Quality and safety control of works.
  • Control of availability of the necessary licenses, certificates of admission with construction subcontractors, suppliers of equipments, machinery, materials, and constructions.
  • Control of works, gradual acceptance of the executive and production documentation, its formalization and transfer to the client
  • Organization and control of closing-down of the object in case of temporary cessation of construction.
  • Organization of the necessary works related to soil and structure monitoring.
  • Interaction with state regulatory and supervisory authorities.

For detailed information please CONTACT US

Please read carefully OUR PROJECTS